Project Foundations

Project Foundations

This assignment has four problems, and each problem is worth 25 points

Answers for the assignment’s problems must be integrated into a Word document that will be named following this structure: LastName_FirstName_Asgn1. In my case, such document would be named Flores_Javier_Asgn1.
Problem 2 requires drawing a network diagram. You may use MS Visio, which is available on the Skylab assigned to the school of business. Also, you could use Draw.IO Links to an external site., or the shapes/drawing capabilities of PowerPoint or even draw the diagram by hand. After completing the diagram, you can capture the network diagram image, crop it and paste it in the Word document you will use to turn in your assignment. It is important that you upload a good quality image to facilitate the grading. Further, I posted videos or supplemental materials that show how to use MS Visio, Draw.IO, and the snipping tool (cropping) from Microsoft to facilitate your work.
Problem 3 requires using MS Project or Project Libre. This problem also requires capturing the images that show your work. Additional information is available in the body of the problem statement. Also, I have provided video resources that illustrate how to use MS Project and Project Libre. Project Libre is available at
Assume that a week has 5 working days. That means that in the “duration” field of a task you can enter either “5 days” or “1 week” if you want to schedule the duration of one week. Something similar applies to durations of more than one week.
You will turn-in (upload) in Canvas:

Word document-file integrating all your answers
MS Project or Project Libre file showing your work for problem 3
Problem 1
Calculate the expected time for the following activities

Answer Preview

APA Format, 527 words

Open chat
Hello
Contact us here via WhatsApp